Sunday, October 25, 2026
+254792543901 Donate Advertise
    Home
    Sign In
    Register
    Donate
  • This is a menu which is invisible
 Logo
Home Business & Investments News Environment & Climate Opinion Sports Technology Health Agriculture Law & Order Regional & Global News Entertainment & Lifestyle Support JLC Advertise
JLC News

    Login to enjoy services

  • Login
  • Reset Password
  • Home
  • About
  • Advertise
  • Support
  • Blog

Nairobi Building Collapse: ACEK Calls for Stricter Construction Oversight as Seven Remain Missing

2026-10-24 19:45:25(16 hours ago)
News Nairobi Building Collapse
nairobi-building-collapse-acek-calls-for-stricter-construction-oversight-as-seven-remain-missing6adce0a54e23b.jpg

Posted by EDITORIAL

0 likes
71 views
0 comments

Nairobi building collapse leaving seven people missing as ACEK calls for stricter construction oversight, professional accountability and improved building safety.

In Summary:

The collapse of a building exceeding ten floors under construction along Yusuf Haji Avenue in Nairobi’s Kamukunji Sub-County has raised fresh concerns about construction safety and regulatory enforcement, with seven people still unaccounted for. The Association of Consulting Engineers of Kenya (ACEK) has called for stronger construction oversight, professional accountability and stricter compliance with building regulations, warning that public safety must remain a priority as rescue operations continue and investigations seek to establish the cause of the disaster.

Also Read:85 % of Buildings in Nairobi failures the safety test

Also Read: Why Government's needs to Build more public trust

The collapse of a building exceeding ten floors under construction along Yusuf Haji Avenue in Nairobi’s Kamukunji Sub-County has renewed scrutiny of Kenya’s construction safety standards, with the Association of Consulting Engineers of Kenya (ACEK) calling for stronger regulatory enforcement, professional accountability and stricter compliance with building regulations.

The incident, which occurred on Friday, left seven people unaccounted for as rescue teams continued searching the rubble. It has also raised fresh questions about the effectiveness of construction oversight and the safeguards needed to prevent similar tragedies.

According to Interior Cabinet Secretary Kipchumba Murkomen, who visited the scene on Friday evening, 67 construction workers were at the site when the building collapsed. While 66 escaped unharmed, one sustained injuries and was taken to hospital in stable condition.

The seven missing people are believed to have been operating 11 shops located on the building’s ground floor and basement. Authorities have maintained that rescue efforts remain a priority, with a multi-agency team continuing operations to locate those trapped beneath the debris.

The rescue operation, which continued into Saturday, brought together the Kenya Defence Forces, National Police Service, Nairobi City County Government, National Youth Service and the Kenya Red Cross.

The Ministry of Health also activated disaster response protocols and established a 24-hour desk at the scene to support the emergency response.

Reacting to the tragedy, ACEK described the collapse as a stark reminder of systemic weaknesses in construction governance, emphasising that public safety must never be sacrificed in pursuit of speed, convenience or cost savings.

The association said preventing similar incidents requires strengthening the entire construction governance system, from project design and professional supervision to regulatory inspections and enforcement.

ACEK called for the engagement of qualified and licensed professionals throughout the construction process, alongside more frequent site inspections and stronger accountability for developers, contractors, consultants and supervisors.

It also advocated for digital construction monitoring and compliance systems, increased public awareness of the dangers associated with unauthorised developments, and closer collaboration among regulatory authorities, professional institutions and other industry stakeholders.

According to the association, ensuring that construction projects meet the required professional and regulatory standards is essential to protecting lives and safeguarding public confidence in the built environment.

Investigations Needed to Establish Cause

While the collapse has intensified concerns about construction practices, ACEK cautioned against drawing conclusions about its cause before investigations are completed.

The association maintained that only a detailed forensic engineering investigation can establish what caused the building to come down.

ACEK noted that building collapses worldwide can be associated with several factors, including structural design deficiencies, poor workmanship, substandard construction materials, deviations from approved drawings and inadequate site supervision.

Other possible contributing factors include overloading of structural elements, weak foundations, unauthorised alterations and failure to comply with applicable building regulations.

However, the association stressed that these are general risk factors and should not be interpreted as findings about the Kamukunji incident.

Establishing the actual cause will require investigators to examine the building’s design, construction methods, materials, approvals, supervision records and compliance with relevant technical requirements.

Such an investigation will be critical in determining whether the collapse resulted from technical failures, regulatory shortcomings or other circumstances.

Accountability Must Follow Evidence

ACEK further warned against assigning blame to individuals or organisations before investigations establish the facts.

The association said accountability must be guided by evidence and due process, noting that responsibility, where established, could extend to developers, contractors, design consultants where negligence is proven, site supervision personnel and regulatory authorities where enforcement failures are demonstrated.

Other parties found to have acted outside the law could also face responsibility, depending on the findings of the investigations.

The position underscores the importance of distinguishing between suspected failures and proven wrongdoing, particularly in a disaster that has placed construction safety and regulatory oversight under renewed public scrutiny.

ACEK said it was ready to support relevant authorities, professional bodies and investigative agencies in establishing the facts and identifying lessons that could help prevent future incidents.

The Kamukunji collapse places renewed attention on the need for effective enforcement of construction standards in Nairobi and across Kenya.

Beyond determining the immediate cause of the disaster, the incident highlights the importance of ensuring that building approvals, professional supervision, inspections and compliance requirements translate into practical safeguards on construction sites.

For families waiting for news of their missing relatives, the immediate priority remains the safe recovery of those still unaccounted for. For the construction industry and regulatory authorities, the longer-term challenge is to ensure that investigations lead to meaningful corrective action.

ACEK urged Kenyans to support the rescue teams, offer comfort to affected families and hope for the safe recovery of those missing, while wishing the injured a full recovery.

As investigations proceed, the incident serves as a reminder that construction safety depends not only on regulations but also on their consistent implementation, effective supervision and accountability where violations are established.

READ MORE NEWS HERE

Please login to comment or reply

Comments(0)
Latest Posts
Business & Investments
AA Kenya Road Safety Awards 2026
Environment & Climate
Faith Leaders Demand Climate Finance and Energy Justice Ahead of COP31
Health
Kenya’s Ebola Response Hinges on Transparency, Timely Information and Public Cooperation
Business & Investments
Nairobi Trust Summit Targets Economic Cost of Distrust
News
Kenya Media Houses Face New Push for Disability-Inclusive Reporting
Business & Investments
PS Mang’eni Urges African Stock Exchanges to Open Up Capital for MSMEs
KCB
Top Categories
  • News
  • Agriculture
  • Entertainment & Lifestyle
  • Sports
  • Business & Investments
  • Regional & Global News
  • Health
  • Law & Order
  • Environment & Climate
  • Technology
  • Opinion
  • FACT CHECKING
Share Post

Share on your favorite platform

Bimalife Insurance

JLC News Logo

JLC News an independent media house committed to connect, inform, and enlighten audience through trustworthy reporting. Provides with media facilitation, working with credible journalists to ensure accuracy and effective dissemination.

Navigate

  • Home
  • Support
  • About Us
  • TOS
  • Contact Us

JLC News Support

P.O BOX 35050 - 00100, CBD - Nairobi, Kenya.

+254792543901

+254792543901

support@jlcnews.com

© 2026 - JLC News Inc | Dev by Codekali

This app uses cookies to ensure you get the best experience on our platform. Learn more